Description
Turn 3-Man Concrete Jobs Into 1-Man Jobs:
- 1 yard per hour output — “Pour concrete as fast as you can load the hopper”
- 45 – 80lb bags/hr through the machine with no equipment failures
- Works anywhere trucks can’t reach — basements, tight spaces, second floors
- Waterproof solenoid & upgraded electrical — reliable performance in any job site or weather condition
- Reinforced steel chute with precision flow control — handles rocks without damage
- Stainless steel fittings & 3-position locking — built for daily commercial use


